Use case: peak demand and tariffs

How to reduce peak demand charges and stay inside your tariff band

Reducing peak demand charges means keeping the highest interval of electricity use below the level your tariff penalizes. Aqueduct tracks demand as it builds, shows which feeders drive the peak, sequences loads where control is enabled with owner approval, schedules solar or backup generation against it, and watches power factor so reactive penalties are visible.

Powered by aQ EnergySmart and Smart Controls, built on aQ Core
Electrical cabinet with tagged breakers
Peak demand today
612 kW
Contracted 650 kWChillers sequenced
Demo data
Energy balance · active power
412Grid+146Solar=338HVAC+99Light+16Loss
Power factor 0.96Carbon today 1.9 t
Demo data

Keep the highest interval under the band, and see the peak coming.

See the peak build

Demand tracked live against your tariff

  • 24-hour demand

    The daily demand curve updates every 60 seconds against your tariff bands.

  • Feeder breakdown

    The electrical twin shows which feeders and assets are building the peak.

  • Forecast to the band

    Demand trending toward the band is flagged while there is still time to act.

Breakers and wiring in a panel
Peak demand today
612 kW
Contracted 650 kWChillers sequenced
Demo data
Shape the load

Loads staged so they do not stack

  • Load sequencing

    Large loads start one after another, where control is enabled with owner approval.

  • Sources scheduled

    Solar, backup generation and batteries can be scheduled against the peak where present.

  • Command history

    Every staging command and its result is recorded in command history, ready for audit and M&V.

Circuit breakers in a distribution board
Energy balance · active power
412Grid+146Solar=338HVAC+99Light+16Loss
Power factor 0.96Carbon today 1.9 t
Demo data
Fix power factor

Stop paying for power you never use

  • Power triangle

    kW, kVAR and kVA with the phase angle show how far power factor has drifted.

  • Loading per feeder

    Each feeder shows its load against rated kVA, so correction can be targeted.

  • Reactive penalty

    The reactive penalty is shown in money from your tariff, alongside the demand charge.

Testing wiring in a control panel
Bill validation · September
Supplier billed184.2 MWh
Metered176.9 MWh
Difference7.3 MWh
Demo data
Old way vs the Aqueduct way

Peak demand, before and after Aqueduct

The old way
  • The peak is discovered on the invoice.
  • Every large load starts at the same time.
  • Low power factor costs money nobody sees.
  • Solar and generators run on their own logic.
  • Demand savings are estimated, never measured.
The Aqueduct way
  • The peak is seen building on the electrical twin.
  • Loads are sequenced where control is enabled.
  • Power factor and penalties are shown per feeder.
  • Sources are scheduled against the peak where present.
  • Avoided charges are calculated from the meter and tariff.
Problem

Why demand charges surprise everyone

A single interval can set the demand charge for the whole month.

01

Everything starts at once

Refrigeration, HVAC and process loads start together in the morning and set a peak nobody planned.

02

Seen only on the invoice

Finance learns about the peak weeks later, when nothing can be done about it.

03

Power factor ignored

Low power factor means paying for apparent power the site never turns into useful work.

04

Sources not coordinated

Solar, backup generation and batteries run on their own logic, not against the peak.

One incident, start to finish

How Aqueduct manages peak demand

One avoided peak, start to finish.

Monitor

Power meters on the main and on feeders report kW, kVAR, kVA and power factor into the electrical twin every 60 seconds.

Measure

The 24-hour demand profile is measured against your tariff bands and your typical peak for that day type.

Identify

Morning demand climbs toward the band. The twin shows HVAC and refrigeration feeders starting together.

Act

Loads are sequenced so they do not all start at once, where control is enabled with owner approval, and solar or backup generation is scheduled against the peak.

Verify

The monthly peak stays under the band, and the avoided charge is calculated from your tariff and verified on the meter.

On site

What it needs on site

Existing power meters connect over Modbus, BACnet or pulse. New devices are installed through partners.

DeviceWhat it measures or doesWhy it matters
Main power meterkW, kVA, power factor, demandThe number your tariff charges against
Feeder or equipment power metersLoad per feeder or major assetShows which loads build the peak
Relays or field device controllersOn, off, staging and setpointsSequencing where control is enabled, with owner approval
Solar, generator or battery data (if present)Generation and stateLets sources be scheduled against the peak
Tariff and 6 to 12 months of billsDemand bands and ratesTurns kW into money and sets the baseline
Control panel switches
What we believe

The monthly demand charge is decided in a single interval, so watch it live.

Talk to our team
Problem, solution, impact

Outcome

What changes when peak is managed live.

The problemHow Aqueduct solves itThe impact
Energy

Demand charges seen only on the invoice.

Peak kW tracked as it builds against the tariff band.

Peaks managed before they set the monthly charge.

Energy

Reactive power penalties ignored.

Power factor and loading per feeder on the electrical twin.

Correction opportunities visible with their cost.

Operations

Loads started without coordination.

Load sequencing where control is enabled, with command history.

Starts staggered without affecting operations.

Personas

Who cares about this

The seats that ask for this first.

CFOs and finance teams

Demand charges forecast and explained before the bill.

Learn more

Building, MEP and controls engineers

Feeder loading, power factor and sequencing rules.

Learn more

Operations leaders and COOs

Staggered starts that do not disrupt production.

Learn more
Read your bill differently

An electricity bill is several bills with different causes

Total kWh hides components that respond to completely different remedies.

ComponentWhat sets itRemedyVisible without interval metering?
ConsumptionTotal energy across the periodEfficiency, scheduling, load reductionOn the bill, with no attribution
Demand chargeThe highest interval in the periodLoad sequencing, generation timed to the peakNo, the event is over before the bill
Power factor penaltyReal against apparent powerCorrection sized on measured loadNo, and often misdiagnosed
Distribution lossesLoading and layout of your own networkLoad balancing, reconfigurationNo, they sit inside your site
Who builds the peak

The loads that stack into a demand peak

Peaks are usually coincidence, not requirement: individually reasonable loads starting together.

Chillers and RTUs

Where it goes wrong

Morning pull-down after a weekend or night setback

What we measure

Feeder kW per unit

What Aqueduct does

Staggers starts where control is enabled

Refrigeration

Where it goes wrong

Defrost and recovery coinciding with other loads

What we measure

Compressor feeder kW

What Aqueduct does

Shows overlap on the 24-hour profile

Compressed air

Where it goes wrong

Compressors loading together at shift start

What we measure

Compressor kW and runtime

What Aqueduct does

Sequences units where enabled

Process lines

Where it goes wrong

Furnaces, heaters and motors starting with the shift

What we measure

Line feeders

What Aqueduct does

Identifies the collision time

EV charging

Where it goes wrong

Chargers drawing at arrival time

What we measure

Charger feeder kW

What Aqueduct does

Schedules against the peak where present

Lighting

Where it goes wrong

Whole-site lighting on at once in large venues

What we measure

Lighting feeder kW

What Aqueduct does

Relays stage circuits where enabled

Power factor

Where it goes wrong

Inductive load raises apparent power

What we measure

kW, kVAR, kVA per feeder

What Aqueduct does

Shows reactive penalty in money

How it works

The questions to answer about last quarter's peak

01

When was it?

The date and interval of the highest demand reading, from interval data rather than the bill.

02

What was running?

Which feeders and assets contributed, from the electrical twin.

03

Was it needed?

Whether those loads had to overlap, or simply started together.

04

What would staging cost?

Whether loads can move by minutes without affecting comfort, product or process.

05

What was the power factor?

Whether reactive power added a penalty on top of the demand charge.

How it rolls out

From the bill to a managed peak

An illustrative sequence for a site with large cooling, refrigeration or process loads.

1
Week 1

Tariff and bills

The tariff, demand bands and 6 to 12 months of bills load, so every kW can be priced and the baseline is set.

2
Weeks 2 to 3

Interval and feeder metering

The main meter reports interval demand and power factor. Feeder meters are added on the loads most likely to build the peak.

3
Weeks 3 to 6

Understand the peak

The 24-hour profile shows which loads collide and when. Engineers decide which starts can move and by how much.

4
Month 2 onward

Sequence and verify

Loads are staged where control is enabled, with owner approval. Avoided charges are calculated from the meter and tariff each cycle.

Trusted at scale
Read the case studies
Deployed275+

sites in 21 countries run on Aqueduct.

Healthcare22 hospitals

and 9 clinics in one of India’s top hospital chains.

AirportsTop 25

US airport running water intelligence on Aqueduct.

Real estate20M+ sq ft

of commercial real estate under Aqueduct.

Manufacturing300 acres

FMCG manufacturing campus.

Food and dairyMajor dairy

operations run on Aqueduct.

Questions

Common questions

Track demand as it builds, find the loads that start together, and stagger them so the highest interval stays under your tariff band. Aqueduct does this live on the electrical twin and sequences loads where control is enabled with owner approval.

Load sequencing means starting large loads one after another instead of together, so their demand does not stack into a single peak. For example, refrigeration is not started at the same time as process lighting or HVAC.

Low power factor means current and voltage are out of phase, so the site draws more apparent power than it turns into work. Many tariffs penalize this. Aqueduct shows power factor and loading per feeder so correction can be targeted.

Where those sources are present and control is enabled with owner approval, yes. The electrical twin balances grid import, solar and backup generation against the loads, so sources can be scheduled to flatten the peak.

A main power meter, feeder or equipment meters for the largest loads, your tariff structure and 6 to 12 months of bills. Control devices are added only where sequencing will be automated.

Yes. Aqueduct is device agnostic and reads power meters over Modbus, BACnet, pulse and other protocols.

Some tariffs carry a high demand reading forward into later billing periods, so one interval can affect several months of bills. Check your tariff; Aqueduct tracks the reading that would set it.

Yes. Demand is set within a short interval, so monthly totals cannot show it. A main power meter reporting kW at short intervals is the minimum, with feeder meters to show the cause.

It measures kW, kVAR and kVA per feeder over time, which gives an engineer the measured load profile needed to size and place correction rather than relying on nameplate assumptions.

Sequencing delays starts by minutes and is set by your engineers. It runs only where control is enabled, with owner approval, and comfort and process conditions are tracked alongside.

It can, when generation runs during the intervals that set the peak. Aqueduct shows grid, solar and backup generation on the electrical twin so generation can be scheduled against the peak where present.

See Aqueduct on your own facility.

Bring a site, a utility bill or a question. We will show you where the loss is.