Ways in: replace your BMS

BMS replacement for facility owners whose controls have aged out.

Aqueduct can replace a BMS, BAS or EMS, along with water management and indoor air quality systems, by controlling equipment directly through LoRaWAN relay switches and through Modbus or BACnet via a field device network controller. Which functions are replaceable at your site is confirmed site by site, and every action runs with owner approval and an auditable command history.

Large industrial fans on a plant wall
Command history · RTU-2
Occupied mode07:00 · executed
Economizer on07:12 · executed
Lockout active07:13 · held
Demo data
Compressor 2 · condition
7.1 mm/s vibration
Maintenance scheduled before failure
Demo data

When controls have aged out, take them over and prove every result.

Direct control

Equipment controlled through relays and field devices you can trust

  • LoRaWAN relays

    Exhaust fans, control fans and lighting switch through LoRaWAN relay switches where control is enabled.

  • Modbus and BACnet

    AHUs, RTUs, chiller plants and VAV boxes are controlled through a field device network controller.

  • Control clusters

    Devices and sensors group into one system, so a zone sensor can inform how an RTU behaves.

Air conditioning units on a building wall
Command history · RTU-2
Occupied mode07:00 · executed
Economizer on07:12 · executed
Lockout active07:13 · held
Demo data
Equipment twins

Every rooftop unit shown as components and live states

  • Component states

    Dampers, cooling, heating, fans and the economizer each show a live state instead of raw points.

  • Control quality KPIs

    Setpoint attainment, comfort compliance and sequence exceptions show whether control is working, on every tab.

  • Early signs of failure

    Vibration, sound signature and energy drift schedule maintenance first, before a unit fails in service.

Plant equipment in an industrial hall
Compressor 2 · condition
7.1 mm/s vibration
Maintenance scheduled before failure
Demo data
Occupancy-driven automation

Automations keyed to occupancy, with lockouts and full history

  • Occupancy triggers

    Occupancy from sensors or schedules triggers rules that change how equipment runs in each zone.

  • Lockouts by design

    New commands wait while one is still acting, which protects equipment from short cycling.

  • Savings on a baseline

    Equipment power is baselined first, so savings from automation are reported against measured use.

Corridor between stainless tanks
Site performance · this quarter
-8.4% vs expected
Weather normalizedBelow baseline
Demo data
Old way vs the Aqueduct way

Aged-out controls versus controls you can measure

The old way
  • Controllers nobody can support still run critical equipment.
  • Water, energy and air each need a separate system.
  • Nobody can prove what a control change achieved.
  • Control runs with no baseline to measure against.
  • Failures are discovered when the unit finally stops.
The Aqueduct way
  • Relays and field devices put equipment under supported control.
  • One platform covers water, energy and air with equal weight.
  • Command history and the meter prove what each change did.
  • Every unit is baselined before savings are claimed.
  • Early signs of failure schedule maintenance before the stop.
The problem

Signs the BMS has aged out

Replacement is not a slogan. It is the right door when the system in place has stopped earning its keep.

01

Controllers no one can support

Parts are hard to source and every change needs an outside contractor.

02

Separate systems for each resource

One system for HVAC, another for energy, another for water and none for air. Nothing adds up.

03

No proof of what changed

Local, unlogged changes leave nothing to audit when a saving or a complaint is questioned.

04

Control without a baseline

Schedules run, but nobody can say whether they save anything after weather.

Which categories Aqueduct can take over

Aqueduct can fully absorb these categories. Which functions are replaceable at your site is confirmed site by site during scoping.

CategoryWhat Aqueduct takes over
BMS and BASSequences, schedules and control of AHUs, RTUs, chiller plants, VAV boxes and other equipment
EMS and BEMSMetering, demand, bill validation, weather-normalized baselines and HVAC savings M&V
Water managementWater balance, leaks and loss, baselines, treatment plant efficiency where RO and STP are metered
IAQZone air targets with ventilation response, balanced against energy
FDDFaults found, diagnosed and fixed, with the ticket routed to your CMMS
M&VSavings verified at the meter against a modeled baseline

How Aqueduct controls equipment

Two ways, and only two. Both are standard, and both are installed by partners.

LoRaWAN relay switches

For simple on and off loads: exhaust fans, control fans, light switches.

Modbus or BACnet field devices

Through a field device network controller, for AHUs, RTUs, chiller plants and VAV boxes.

Control clusters

Devices and sensors grouped to operate and be analyzed as one system.

Occupancy-driven automation

Occupancy from sensors or schedules triggers rules and changes how equipment operates.

Lockout warnings

New commands wait while one is still being acted on, which prevents short cycling.

Command history

Every command audited for whether it actually executed on the device.

How it works

How a replacement runs

Replacement is staged, not a weekend cutover.

01

Survey

Map what is installed, what works and what has aged out, site by site.

02

Confirm scope

Agree which functions Aqueduct takes over at this site and which systems stay.

03

Connect

Partners install relay switches, field device network controllers, meters and sensors where needed.

04

Baseline

Upload 6 to 12 months of utility bills for day-one baselines, or build one from at least 6 months of data.

05

Run and verify

Control runs with owner approval. The meter verifies the result, and it becomes the new baseline.

Industrial machinery in low light
What we believe

Replacing controls only makes sense when every result can be measured afterward.

Talk to our team

Control quality you can measure

On the device digital twin, control performance is tracked live.

MeasureWhat it tells you
Setpoint attainmentHow often the equipment reaches the setpoint it was given
Comfort complianceHow often the space stays inside its comfort band
Sequence exceptionsHow often the equipment departs from its expected sequence
Communication healthWhether the device is talking to the platform reliably
Who it is for

The three seats

Facility head
“Can this replace my BMS, BAS and EMS, or only sit beside them?”

It can replace them. Which functions at your site is confirmed site by site, and you can keep anything that still works.

Infrastructure head
“Does replacement extend to my network control?”

No. For water and energy networks, Aqueduct reads alongside SCADA. Control stays with SCADA.

System integrator head
“Can I deliver a replacement?”

Yes. Relay switches, field device network controllers, BACnet and Modbus are standard paths for your crews.

Related

Related terms

Glossary entries for this way in.

Questions

Common questions

Yes. Aqueduct can replace a BMS, BAS or EMS, along with water management and IAQ systems. Which functions are replaceable at your site is confirmed site by site.

Through LoRaWAN relay switches for simple loads, and through Modbus or BACnet via a field device network controller for AHUs, RTUs, chiller plants and VAV boxes.

Aqueduct is facilities and infrastructure intelligence that acts, then verifies. It can replace a BMS, but controls alone are not what it is.

The owner. Aqueduct only acts where control is enabled and with owner approval, and every command is in the command history.

No. Replacement is staged site by site, and anything that still works can stay.

See Aqueduct on your own facility.

Bring a site, a utility bill or a question. We will show you where the loss is.